I kinda guessed that your P2 has taken the place of board1 from the Luna.
wasn't that something that can be cured by recreating your default project to reflect the renumbering of the boards and their I/O?
-greetings, markus-
--
I'm sorry, but my karma just ran over your dogma.
There are no Z-link modules in the startup project, neither in the default.
There are Pulsar analog I/O at now, since I'm checking the balanced lines from the Plus plate of the board.
I use to load them when I need additional I/Os.
Which modules does the default project should contain?
all that you have in there now.
afair making a new project should be done to wipe all references that say your luna Z-Link I/O are located on board1.
I may be wrong here, but I somehow remember after changing the order of the cards it may be a good idea to make a new project from scratch.
-greetings, markus-
--
I'm sorry, but my karma just ran over your dogma.
No error message if the Z-link modules are loaded with the default project, but if I remove one of the modules, or both and then reload it/them, I get the message again; even redoing the setup.
All is working, though.
Is it however better having the P2 as 1st board ( is this issue harmless 360°, i mean ) ?
Cochise wrote: since I'm checking the balanced lines from the Plus plate of the board
The good new here is I don't lose sync any longer connecting my Line6 Pod through AES/EBU instead of SP/DIF, when spikes transients (like switches flicks in the room beside ) are going through the AC line
My default project has no Z-link modules; It's loaded at startup since the command line in the autorun has no longer the -s.
The startup project has Z-link modules, and I recall it from the file menu when Lunabox I/Os are needed.