Posted: Sat Apr 30, 2005 12:38 am
Hello
I have 1 Pulsar1, 1 Luna2 and 1 Luna2 (+AdatEx) in my DAW.
Now i bought a Pulsar2 with ZLink option.
What happen when I replace the Luna2(+AdatEx) with the new Pulsar2 and then load a old project where the Luna2(+AdatEx) was used?
Have I lost all routings to and from the Luna2(+AdatEx)?
mikecw
I have 1 Pulsar1, 1 Luna2 and 1 Luna2 (+AdatEx) in my DAW.
Now i bought a Pulsar2 with ZLink option.
What happen when I replace the Luna2(+AdatEx) with the new Pulsar2 and then load a old project where the Luna2(+AdatEx) was used?
Have I lost all routings to and from the Luna2(+AdatEx)?
mikecw